top of page
< Back

Receiving a New Apartment from an Israeli Developer

Receiving a New Apartment from an Israeli Developer

For many American buyers of new Israeli apartments, the moment of handover, called mesirat dira, arrives after a long wait and often while they are still living abroad. Developers usually send a notice inviting the buyer to receive the apartment on a specific date. What happens at that meeting matters. It is when you confirm that the apartment matches the contract and specification, record visible defects in a signed protocol and receive keys, documents and utility details. Arriving unprepared, or sending a representative without clear instructions, can weaken later claims. This guide outlines how to prepare and what to insist on.

Conditions Before Handover

A developer may deliver an apartment only after the building has received an occupancy permit from the local authority, commonly known as tofes arba, which confirms that the building is connected to utilities and meets the conditions for occupation.

Ask your lawyer to confirm that the permit was issued and that all payments due before delivery have been made through the correct channels. Remaining balances are usually tied to handover in the contract.

Preparing for the Meeting

Bring the signed contract, the technical specification and any change orders or upgrade agreements. These documents are your checklist. If you commissioned an independent inspector, schedule the inspection just before or on the same day.

If you cannot attend, give written authority to a trusted representative and brief them on what to check. Your lawyer can advise whether a power of attorney is needed.

Bring simple tools that help you check details on the spot, such as a tape measure, a phone charger to test sockets and a small spirit level for floors and counters. A bright flashlight helps reveal uneven plaster and gaps around window frames.

The Handover Protocol

The developer's representative will walk through the apartment and prepare a handover protocol. Every visible defect, missing item or deviation from the specification should be written into it. Do not rely on verbal promises to fix issues later.

Read the protocol before signing and add your own comments if necessary. Signing a protocol that states the apartment was received in perfect condition can make later claims about visible defects more difficult.

  • Room dimensions and layout compared with plans

  • Finishes, tiles, sanitary fittings and kitchen

  • Windows, shutters and the protected room

  • Electrical points, water heater and air conditioning preparation

  • Parking space and storage room allocation

Keys, Meters and Documents

Record the readings of the water, electricity and gas meters at handover so that consumption before delivery is not charged to you. Collect all keys, remote controls and access cards.

Request the warranty documents and user instructions for installed systems, the details of the building management company or house committee and the contact channel for defect reports.

Registering With Utilities and the Municipality

After handover, you become responsible for property tax to the municipality and for utility accounts. Notify the municipality of the change in holder and open accounts with the relevant providers.

If you will not live in the apartment immediately, consider arranging for a local contact to check it periodically and to receive notices on your behalf.

After Handover

Defects that appear after delivery should be reported to the developer in writing, with photographs. The Sale Law gives the developer a right and a duty to repair within reasonable time, and it structures the buyer's rights over the following period.

Keep a dated log of every report and response. That record becomes important if repairs are delayed or disputes arise.

Frequently asked questions

Can I refuse to receive the apartment

You may refuse if the apartment is substantially unfit for occupation or the occupancy permit has not been issued. Minor defects are usually recorded in the protocol rather than used as grounds for refusal. Ask your lawyer before refusing.

Do I need to pay the final installment before handover

Contracts usually require the final payment at or shortly before handover. Your lawyer should ensure the funds are covered by the required security until the apartment is actually delivered.

What if the parking space is not the one I chose

Check the contract and the parking allocation plan. Record any discrepancy in the protocol and ask your lawyer to raise it with the developer immediately.

Is handover the same as registration

No. Handover gives you possession. Registration of ownership in your name usually happens later, after the building is registered as a condominium.

Elkayam Group

As a developer with three generations of building experience and a family background going back to the forties, Elkayam Group has handed over many apartments and knows what careful buyers look for. Our Tel Aviv office at Rival Street 37 works in Hebrew, English and French and can help American buyers prepare for this important day.

Your handover date is approaching and you are in the US. Let our team help you plan it.

+972-53-658-4252 · support@kobielkayamrealestateltd.com · Rival St 37, Tel Aviv

More guides

Related guides

bottom of page
Language · שפה · Langue